Showing posts with label Lewis Bandt Bridge. Show all posts
Showing posts with label Lewis Bandt Bridge. Show all posts

05 March, 2015

Branching out: a Moorabool paddle - rushing around

The final part of Saturday's expedition was less of a paddle and more of a hike - towing the kayaks up and down the rather steep banks of the Moorabool River at this point. After a rocky start to our paddle (described here) from Batesford Bridge followed by a relatively easy 3km section in which we traversed the re-routed section of the river around Batesford Quarry as described in my previous "changing course" post, we exited the formed channel and almost immediately found ourselves confronted by an almost impenetrable wall of reeds.
Into the reeds
There had been a few patches upstream which we'd worked through and around and we did the same here. Once on the other side we found a wide pool and some easy paddling, however as the river narrowed only a short distance away, we were confronted by more reeds. Once again we proceeded to plough our way through, emerging into a small cleared section - much to the surprise of two fishermen standing on the bank.
Pool in the Moorabool below the Ring Road
We gave them a wave and on we went. Another clear section appeared as we approached the remains of the old trestle bridge - part of the Fyansford Cement Works railway which ran between 1924 and 1966 to carry limestone from the Batesford Quarry to the works.
Overlooking the site of the trestle bridge, part of the Fyansford Cement Works
private railway, with the Geelong Ring Road on the rise beyond 
Here however, we could go no further so we hauled the kayaks up the bank and, seeing more trouble ahead, cut across a bend, dropping back to the river once again in another clear section, however, after another short paddle we were out again and then once again.
A pretty little pocket amongst the reeds
This time, we followed the river some 500m past a number of reed-choked sections to the remains of the conveyor belt which carried limestone between quarry and works after the closure of the railway.
From here we were once again able to get on the water and with only a couple of short sections requiring us to haul the kayaks until by early evening we found ourselves paddling under the Lewis Bandt Bridge on the Ring Road.
Lewis Bandt Bridge, Geelong Ring Road
I have looked at this bridge in passing in a previous post and talked briefly about the man himself who was responsible for designing that iconic Australian vehicle - the ute, so I won't elaborate further here.
The places junk can end up!
From this point onwards it was (fortunately) a relatively simple paddle back to Fyansford. Sadly, most of the river through this section is overgrown with exotic plantings and the water quality does not appear as good as further upriver - but this is just my observation. It is also worth noting however, that community activity in the form of weed removal and native revegetation is beginning to occur along the river banks near town.
Then finally, we were faced with one final hurdle - a log jam created I suspect from the dead branches of the woody weeds we had been passing over the last few hundred metres, so for one final time, we dragged the kayaks up the bank, around the logs and dropped back into the water for the paddle to our finishing point - the historic Monier bridge at Fyansford, built in 1900.
Old Monier bridge at Fyansford with the current bridge just visible behind
And so after five hours of rocks, prickles, boxthorn, ants, bees, rushes, reeds, barbed wire and leeches we were finally done. Not exactly a "paddle" I would recommend, however a very interesting part of the Moorabool to have seen at close quarters.

31 January, 2015

A ride to remember

This weekend sees thousands of cyclists once again take to the streets and roads around Geelong, this time in the inaugural Cadel Evans Great Ocean Road Race. The elite men's race will take place tomorrow (Sunday) around a course in part based on the route used during the 2010 UCI World Championships.
This morning however, it was the turn of the citizens when at 7am, almost 4,000 riders left the Geelong Waterfront on a community ride over a distance of either 65km or 111km. All riders head first to Barwon Heads, with the short course riders heading back to Geelong whilst those on the long course followed a similar route to be taken by the elite riders, heading next to Torquay and Bells Beach before returning via an inland route through Moriac to Geelong to take on the seriously nasty hill-climbs of Challambra Crescent, Melville Ave and "Cementies Hill" on the way back to the Waterfront.
Whilst I wasn't up early enough to watch the riders depart, I did come across the tail end of the bunch making their way across the Barwon at Queen's Park before heading up Melville Ave.
Riders in the Momentum Energy Community Ride crossing the Queen's Park Bridge
Some were making harder work of it than others this late in the ride, but spirits still seemed generally high.
Riders heading up "Joey's Hill" to Melville Ave

Meanwhile, things got a little more serious with the start of the elite women's race at 11:30am. I grabbed a spot on the Breakwater Bridge, settled in and waited for the fun to start - and it didn't take long. Within 10 minutes of the race start, I could see the media helicopters overhead and then the support vehicles and media bikes began appearing, accompanied by a sizeable squad of Geelong's finest flashing their reds and blues.
One of four media helicopters covering the race
In a matter of seconds, the peloton appeared around the corner...
The peloton sweeping around the corner over the bridge
...and then just as quickly, they were gone..
The rear of the peloton crossing the Breakwater Bridge
Meanwhile above the river, one of the local White-faced Herons was forced to share airspace with a much larger type of bird:
There were several birds in the sky today.
Then, while the peloton headed off to take in the sights of Barwon Heads and the Great Ocean Road, I headed for "Cementies" (Hyland Rd in Fyansford which runs up beside the cement works). I arrived (via bike) in time to take up pole position on the seat half way up. There were a couple of other amateur snappers already waiting a little further up the hill and as we waited...and waited...well past the expected time of arrival, several more of the locals wandered down for a look.

One of Cadel's boys sussing out the course
At one point, a couple of the men's teams headed past - no doubt checking out the route for tomorrow's race - then we were treated to the spectacle of local Geelong West legend Sebastian Flaccavento slogging his way up the hill on one of his tiny bikes. He had his seat up nice and high today as he does for long rides, so I can only assume that he was the last rider through in the earlier community ride (the long course...of course).

Sebastian making his way up "Cementies"
After Sebastian came and went, we continued to wait. By now I had become quite well-acquainted with the lady standing to my left who then introduced me to a friend who also arrived. And still we waited. I know that the riders had expressed concern about the high winds forecast leading up to the race and I suspect their concerns were justified.

Not long to wait now...
It was not until about 2:30pm that the lead rider appeared around the corner and headed up the final hill. This as it turned out, was South Australian rider Rachel Neylan from the Building Champions Squad who made her move up Melville Ave and managed to hold off Valentina Scandolara from Orica - AIS and Tessa Fabry from High5 Dream Team to take the win.
Orica - AIS rider Amanda Spratt climbing the hill
After the lead riders passed, we waited in vain for any sight of a peloton. It seems the hills had taken their toll and the group pictured below was the largest remaining.
The remains of the peloton heading up
The tight bunch which had crossed the Barwon at Breakwater, had been torn to shreds by the time the riders climbed the hill above the Moorabool and somehow I doubt they had time to appreciate the view!
Looking past the riders to the Ring Road and the Lewis Bandt Bridge over the
Moorabool River

08 April, 2011

"Ring! Ring!"

Riders along the Barwon
Ring Road that is! Today's escapade saw us take to the bikes again to investigate the relatively new track which runs alongside stage 1 of Geelong's Ring Road. Rather than take a shorter ride across town and fight with the traffic, we chose to take the scenic route and get our dose of the river along the way. I couldn't resist the urge to grab a "large, weak, skinny cap, please" from Barwon Edge on the way past and we sat at a conveniently located table a little further up the track to have morning tea, watching the usual array of cyclists, joggers, walkers and - a new one on me - a pair riding horses.
And so to Fyansford and the one hitch with this particular route - the cement works hill. Taking it somewhat slower than my last attempt and at a walk after losing my chain, we made it to the top then headed for the Gabrielle Blythe Linear Park for the ride around to Church Street.
This is not the most direct route to the Ring Road track, but it is more scenic than McCurdy Road which has the added disadvantage of no bike lane (although traffic is not heavy).
Lewis Bandt Bridge on the Geelong Ring Road from
the Ted Wilson Trail
As I have mentioned previously, I would also like to see the linear park provide an alternate route to busy Church Street by which to reach the waterfront.
Our detour turned out to be well worthwhile as we came across a group from the Bellarine Railway who were just starting the process of ripping up the rails as I had seen discussed in the papers only a week or so ago. We were informed that these rails would be re-laid in a section of the Bellarine line near Laker's Siding as they were longer than the existing rails and the resulting reduction in joins would mean a smoother ride for the trains.
Leaving the guys to their work, we headed to Church Street and then via the bike lane, the short distance to its western end. Had we chosen to ride in the other direction, we could have connected - as we did on our previous ride - with the trail around the bay, but this time, we were headed north.  
From the end of Church Street, it was a matter of metres to the beginning of the Ted Wilson Trail and a short stop to take in some sweeping views of the Moorabool Valley, the old quarry at Fyansford and the Barrabool Hills. 
Before we continue, it is pertinent to mention that Ted Wilson, after whom the trail is named, is a now-retired police officer from Geelong who was instrumental in establishing the Bikeplan program which was piloted in Geelong in the 1970s and 80s and in developing the Bike Ed program which is still taught in Victorian schools today. Ted was also responsible for the re-introduction of police bike patrols across the state in the 1990s. Now, where was I? 
View towards the Batesford Quarry
The Church Street end of the trail was perhaps the most picturesque section which otherwise spends much of its distance shielded from the traffic of the Ring Road behind the large, steel noise barriers. On the other side, the track opens on to suburban backyards and in some parts, on to neighbouring parkland. From the intersection of the Ring Road with the Midland Highway (aka Ballarat Road), there is a good view of the Batesford Quarry, a little further up the Moorabool River.
Along its length, the track is well made from concrete and makes for good riding with minimal road crossings over fairly even terrain up to Cowie's Creek. From there it heads downhill to - I am informed by the local media - Broderick Road in Corio, a total distance of 11.4km. However, we did not have time to go further on this occasion, so discovering the remainder of the trail will have to wait for another day.From this high point above the creek, the view extends north towards the You Yangs Regional Park and west across the northern suburbs of Geelong to the Shell oil refinery which, whilst rather industrial and mundane during daylight hours, becomes quite spectacular at night when it is ablaze with lights.
Looking south along the Ted Wilson Trail
Further contributing to the somewhat industrial feel is the looming presence of high-voltage power lines running above the track for some of the way. Clearly this is a new pathway which has had little time to develop. A concerted effort at tree-planting could go a long way to breaking up those somewhat bland sections which do not have a substantial view. Tree-cover would also provide a significant boon to the local bird-life and on a warm day such as today, would provide some welcome shade for those using the trail.
Another aspect which was brought to my attention was signage. The comments were made on another website bemoaning the lack thereof and in retrospect, yes, they have a point. By word of mouth I knew the trail started at the bottom of Church Street, but there was no sign at any point to inform me of this, nor, as was also pointed out, is there any sign at the major road-crossings (at least one of which required multiple sets of traffic lights to negotiate) which shows where or if the path continues on the opposite side of the road.
Despite these shortfalls, this is still an interesting and well-constructed trail and I am looking forward to investigating the remaining kilometres to Broderick Road at some point in the near future....

01 April, 2011

Riding the rails...

...well, the rail trails that is!
Whilst I run, walk and ride the sections of the river from Breakwater to Baum's Weir fairly regularly and have done for some years, I do occasionally venture further afield for a change of scenery. Of late, I have been riding more often and as a result of being able to cover more distance, have been looking for other tracks and trails to ride.
I have started by revisiting several of the tracks which I have run in the past: the Bellarine Rail Trail, the track to Waurn Ponds, the linear park running along the disused train line from the cement works to North Geelong, the Waterfront. All of these are - or have the scope to be - excellent community facilities for those wishing to run, walk or ride effectively from one side of Geelong to the other. 
Looking at the cement works across the junction of
the Barwon and Moorabool Rivers at Fyansford
And they all have one important feature in common: at some point, they all link, or will eventually link to the Barwon River.
So, with this in mind, yesterday's excursion stemmed from a couple of runs I'd done in the past and a desire to prove that I could run up "Cementies Hill" (the hill which runs up from Fyansford past the now decommissioned Australian Portland Cement works).
My original run in January of 2010, took in the river up to Fyansford, the hill and part of the old railway line running between the cement works and the docks. This line has not been used since the closure of the cement works, but a walking/riding track now runs beside the line. Much of the infrastructure is still present including the rails and signage.
Originally opened in 1918, the line ran from the cement works to North Geelong where it connected with the Geelong-Ballarat line, servicing the cement works and also providing a public goods service. Incidentally, Australian Portland Cement also ran their own private 3'6" gauge railway from 1926 which serviced the quarries, carrying limestone up to the works. When the line closed in 1966 the one diesel and six steam engines were preserved in various museums. Today, five of the six steam engines are in the keeping of the Bellarine Railway and some are used to pull the tourist train which runs between Queenscliff and Drysdale (see my subsequent blog).
Railway sign, Herne Hill
But now, back to my ride! From the cement works, I headed up Church Street to connect with the Waterfront to take me around to Limeburner's Point before working my way back home via East Geelong. All up, about 20km. Not quite half marathon distance. As far as runs go, it is a somewhat scrappy, disjointed route with several road crossings which make it difficult to get a decent rhythm going. From a cycling perspective it is not too bad, providing either off-road trails or on-road bike lanes the majority of the way.
What would be ideal is a complete loop for walking, running and riding linking Fyansford with the Waterfront and on the other side of town, the river to the Waterfront. I know this is under consideration by the powers that be, however it has yet to be fully implemented.
In September 2010 when the World Championship Cycling was on its way to Geelong, there was a significant amount of action around the trails. Various parts of the river trail were resurfaced, new signage was put in place and the beginnings of a shared footpath/bike track was installed on Swanston Street between the river and Fyans Street. This was a great improvement. The problem however, was the way the remainder of the link to the Waterfront was to be achieved. A Copenhagen style bike lane with a cycling lane running between the footpath and parked cars was mooted and rejected. Local residents and businesses had concerns about changes to the availability of parking which is already at a premium in the area. This idea was shelved.
Over subsequent months, an on-road bike lane was marked out as far as Kilgour Street and the necessary changes made to the footpath structure. The paint rapidly faded and nothing else happened. In recent weeks however, the paint has been re-applied and and new markings now take the lanes as far as the McKillop Street intersection. Great! But what now?
Over the last few months I have made regular use of the bike lane to the river but on Tuesday as I was riding to the Waterfront felt somewhat vulnerable without my paint barrier. I can only hope that there is enough cash in the budget to take the road markings as far as the Waterfront in the not-too-distant future. But of course, funding may not be the only issue. As far as I am aware from the local media, a decision was still to be negotiated as to exactly what form the remainder of the trail would take.
Lewis Bandt Bridge across the Moorabool Valley on the
Geelong Ring Road
At the other end of my proposed loop, things may be looking a little brighter, partly because some of the required infrastructure is already in place. An off-road track runs up the hill to the cement works. It is in good condition and connects conveniently with the river trail at the bottom and with the linear park at the top - assuming you have the lung capacity to make it up the hill, or the nerve to make it down. It is quite steep. I have heard several tales from more than one generation of those occasions when making it to the bottom didn't quite go as planned. Having said that, there is seating at the halfway point for those who need it, and the view is panoramic, taking in the nearby quarry and parts of the Moorabool Valley, including the newly-built Lewis Bandt Bridge on the Geelong Ring Road which pays tribute to the Geelong inventor of that iconic Australian vehicle known as the "ute". The following link provides an interesting description of how the ute came into existence: http://www.fastlane.com.au/Features/First_ute.htm
After making it to the top by whatever means, the linear park begins just a short distance across McCurdy Road. This section of the old railway line extends to the Church Street intersection where a road crossing is required. Its name acknowledges the achievements of Barcelona Olympian walker and local girl Gabrielle Blythe. This, incidentally, is only a short step from the new track which was built alongside the Ring Road. I have yet to investigate this track but when I do, it will probably form part of a future blog.
For now, let's continue with the linear park. The entire path is bitumen-sealed and follows along beside the rails which are still present, however a recent article in the Geelong Times informs me that this is not to be the case for long as the sleepers and rails are to be removed within months. What then happens to the land does not seem to have been clearly decided.
Tom McKean Linear Park
We can only hope that the plan is to continue the already substantial planting and perhaps undertake an upgrade of the track which is suffering from root-damage in some places. In general, the path passes behind houses in the suburbs of Herne Hill and Hamlyn Heights and after reaching Church Street becomes the Tom McKean Linear Park (another Geelong notable citizen whom I believe was a teacher), passing across the Midland Highway and stopping at Thompson Road.
This crossing is the busiest of the three and would be well served if the nearby pedestrian crossing were to be moved to the same location as the path. By now, we are in North Geelong and the scenery is significantly less residential and proportionally more industrial. There is less in the way of tree plantings, but this could be rectified.
It also occurred to me that a lengthy concrete wall could provide an interesting opportunity for a sizeable mural presenting a topic or topics relevant to the area and to the park itself. Also present along the course of the track was the usual array of bird life found in the urban woodland areas of Geelong which could no doubt be encouraged by further native plantings.
Unfortunately at this point, the trail comes to an abrupt halt at Douro Street in North Geelong and it is here that things become complicated. As the crow flies, we are no more than one kilometre from Corio Bay or a little under two kilometers from the end of the bollard walk around the Waterfront at Rippleside Park. However, between Douro Street and the Waterfront is a significant obstacle in the shape of the Geelong to Melbourne railway line, the Princes Highway and some fairly heavy duty industry. How exactly a walking/cycling path would pass through such an area remains to be seen. The present on-road option is to use the bike lane on Church Street, however this is not exactly a scenic, low-traffic alternative.
I have read of various potential plans including developing the track which extends around the coastline to Limeburner's Bay and beyond to Lara. I'm not sure if any of these options approached the issue of a connection to the linear park, however such an option would be a tremendous boon to the community and to the tourist industry generally.
Corio Bay
In the case of my most recent ride, I turned around at Douro Street and headed back the way I had come, however, having reached Corio Bay by whatever means and wanting to continue the loop, the cyclist, jogger or pedestrian can follow the path which runs around Corio Bay, passing the CBD and a variety of cafes and restaurants suitable for a leisurely lunch or a coffee and taking in the renowned bollards along the way. At Eastern Beach you can stop for a swim at the beautifully preserved art deco bathing facility before following the trail around to the Eastern and Botanical Gardens or, to complete our loop, rejoining Swanston Street and heading back to the river.
In the shape of the Barwon and the Waterfront, Geelong has two recreational facilities of international standard. Connecting them via nature trails of benefit to both locals and tourists alike would be of inestimal value to our city.